| Had to rip down the drywall to install the light/wiring. |
![]() |
| And the other side... |
![]() |
| Before. |
![]() |
| After, almost. |
Next! Finishing up the osb installation in the garage. I still have to decide on if I'm going to finish it. I've been thinking of painting and staining each panel a random color. That'll definitely spice up the garage.
![]() |
| The left side before. |
![]() |
| And after. |
![]() |
| Mostly before. |
![]() |
| And after. Those top sections were not fun to lift into place. |
![]() |
| The before, a while back. No A/V room installed yet. |
![]() |
| Door moved to below the beam. |
![]() |
| Wide view from room. |
![]() |
| Wall added to enclose room. |