![]() |
| Liquid Nails everywhere! |
![]() |
| Support wall ready for drywall I don't have. |
![]() |
| All but one tread all secured. |
![]() |
| Give more of an idea of why I did this... |
![]() |
| Liquid Nails everywhere! |
![]() |
| Support wall ready for drywall I don't have. |
![]() |
| All but one tread all secured. |
![]() |
| Give more of an idea of why I did this... |
![]() |
| The before. All bare... |
![]() |
| A look at the profile of the casing, with a little accent at the top. |
![]() |
| All nailed in and ready to paint. |
![]() |
| Painted! Paint color sure looks different in the night compared to day. |
![]() |
| The carpet tear-down. |
![]() |
| All clear for measuring and cutting new angles to match. |
![]() |
| Measuring with t-square and t-bevel to proper angle. |
![]() |
| Cutting away with my circular saw. |
![]() |
| Added a 2x4 to the right for more support. |
![]() |
| A look from a different angle. |
![]() |
| Roughly adding in the new risers and treads. |
![]() |
| I cut out the hole for the center channel speaker too, and pre-drilled holes for the tv mount. |
![]() |
| Will keep the duct line painted white. |
![]() |
| Finished the hallway to the bathroom too, which is in darkness... |
![]() |
| Mudding/sanding the duct probably took the most time. |
![]() |
| And.. the back of the room. |
![]() |
| A look at the fancy theatre lights finally installed. |
![]() |
| First coat on the walls as well... |
![]() |
| Look of the hallway from the basement living room. |
![]() |
| First coat of mud on walls and ceiling. |
![]() |
| Hard to see, but ceiling all done. |
![]() |
| Little easier to see. All complete on ceilings. |