Thursday, October 18, 2018

Door needed some paint

After more than three years of having an unfinished door with only primer on it, it was starting to yellow from the weather/sun hitting it. Mum came to visit and I promptly caught a cold. Since we weren’t going anywhere, we started to paint the front door for fun. Here's the full progress of the door's life cycle from when I bought the house, replaced the door, and final paint.




Have always wanted a red door. Adds a nice pop of color, and seems to match well to the existing brick and house colors.

Monday, September 24, 2018

All finalized

Still had lingering painting to do of doors, even after the bedroom completion, so finally created an assembly-like-line for that and got the remaining done in the weekend. Here's all the pics of the finished product.
Closet doors finally painted and installed.

Ikea closet organizer within.

Bed and new side tables just fit into nook.

Still got an empty space to hang a future tv.

Thursday, September 20, 2018

Carpet is in!

Just got the new carpet installed and it looks great. It's been a year since the carpet was laid down in most of the basement, but I can't tell a difference between the new and old. Here's a quick look at the room now.
Got the new blinds added in too..


Saturday, September 15, 2018

Pop of new color

Well, I wanted to go bold, but was unsure of my decision. Would it be too dark? Would it be too much blue? I think I made a good decision. It's all done now, and the color really pops - especially against the white trim. Not much more to say, here's all the pictures.
Cutting in the walls...

Can see I already painted the closet a lighter, "cottage white" color.

Fully painted with two coats.

Can see I'm still painting a load of doors too.

With accent wall. Really turned out well.

Tuesday, September 4, 2018

Finish work begins

Finally pushed through the last of sanding and started with the finish work. First off, I primed the walls and ceiling, and painted the ceiling with flat white paint. Here's a quick look at that.
Also shows the start of trim-work.
After that I moved onto the woodworking, which has progressed pretty fast. After doing around the door and the surrounding baseboard shown above, I installed the rest of the baseboard, the closet doors, and the window casing in about a day and half. Here's all that work:
Getting the closet doors situated for proper height / fit.

Moulding all tacked in.

Window, in need of finishing.

Wood frame halfway there.

All finished up.
So, next up is painting all the moulding, and then I'll find a paint color for the walls and tackle that.

Sunday, August 12, 2018

Self-Induced Attic Diversion

Never mentioned this before, but after I added all the insulation to the attic above the garage, the garage become nice and cool during the start of the summer, but the rest of the house became unbearably hot. It was actually quite impressive how much hotter the house was than the previous year. On one day the air conditioner couldn't get the house lower than 78 degrees, which it never had an issue obtaining before. After some contemplation, I determined that the attic no longer had an adequate source for incoming air. Having plenty of roof vents which the previous owner had added, and a roof fan (obviously a hint there were issues before), there was plenty of places for the air to exit the attic. Problem was, there were never any inputs, apart from the garage. When I finished insulating the garage attic space, I noticed when standing on the ladder into the attic access, with the garage door and window open, the air rushed past me up into the attic. The attic access was the only place for the incoming air to flow into the attic. I'd suspected this was an issue previously, so I then began the task of cutting in soffit vents in the eaves around the entire house. To complement this, I also added plastic rafter vents to ensure the air flowed into the attic unobstructed. No pictures of that, as it was tough enough setting them in place while stapling them to the underside of the roof.
Long explanation, but here's a look at the work in progress.

What the eaves looked like before the vents.

Cutting into and soffit vents installed.
I placed a vent every other rafter which I thought should be plenty. Turned out to work quite well, as there was a noticeable difference after the installation. I increased the roof fan to kick on after it hits 110 degrees in the attic instead of 100, and it only kicks on now during the hottest days (95+ degrees outside).

Slow Crawl

Since I finished the drywall, I moved onto mudding the wall, which is time consuming in itself. As multiple coats are needed to ensure a good concealment of the seams, it isn't quick work. After that, sanding... and that's brutally slow. I've gotten to that point and am not enjoying it (especially the ceiling bits), so the finishing off of the room has been subjected to a slow crawl. Figured I should post some new pics to show I'm actually doing something though. At this point, most of the sanding is done, but I've got to add some additional mud to the corners, then finish it with yet, some more sanding.


Closet corners/edges took at least 3 coats of mudding.

A look at the ceiling texture.
So far, the mudding and sanding has taken more work than the theater room did. There are so many more edges and corners, and the closet really adds to the total work. As I mentioned in the last post but never showed any photos, here's a look at applying the green glue for the wall that is next to the bathroom. I wanted to make sure that wall transferred as little sound as possible from the bathroom for obvious reasons...