Sunday, March 16, 2014

New Walls Part 1

Finally got to the point where I could start working on putting up the new walls in the exercise room. I cleared up all the walls first, and glued 1" R5 rigid insulation to the walls. I made sure to use Loctite Power Grab which is safe to use on foam. After I glued it to the concrete I taped up all the seamed with IPG red seam sealer tape. Got it from amazon and it works great. Uber sticky. It keeps the moisture barrier intact. After that I used expandable foam around the bottom and tops to seal those gaps. I could have used caulk instead, but some of the gaps were a little too big.


before

after!

before

after!

No comments:

Post a Comment