Well, with the colder temps and holiday season, I feel like I've done next to nothing on the house. Have started back up though and have a few updates... so here's the scoop.
The exercise room is all done. Finished painting all the moulding and the door so it's 100% complete now, minus some possible mirrors I may install.
|
Pull up bar takes up a lot of space, so may have to rethink that. |
|
Look in through the finished door. |
Besides one completed room, I've just be tearing walls down and fixing up little things here and there to prepare for attacking the main "theater room." Took a few pictures of that, so here's a look at the theater room space as it is today.
|
Shows door opening from stairs. |
|
And... panning right. |
From the theater room, it goes straight into a storage/utility room, which I'm going to frame into a audio/video closet, utility room, and expand the adjacent room. Here's a few photos of that taking shape.
|
Was storing all my tools and equipment in the space. |
|
Then, took out the wall that divided it from the adjacent bedroom. |
|
View from the bedroom. |
|
So... I'll push the wall farther out from where it was. |
Next up is framing up where the new walls will be to create the a/v closet and bigger room. Before I do that I've got a few little things to do like insulate the ductwork now as it's more accessible. More to follow soon...