Friday, April 20, 2018

Final framing and electrical

Finished up the major framing and all the electrical work. I added some recessed lights to the framing around the ductwork as it seemed like a nice touch and will add light to the bed or a desk that will be in the space. I also finished the framing for the closet. Took a little bit of time just to figure out the proper rough opening for the closet door sizing that was appropriate. Ended up going with one opening for two 30" wide closet doors.

Put the lights on a dimmer too, so they aren't too bright.

Opening for closet. Looking closely, can see the ceiling is unlevel.

No comments:

Post a Comment