Initially, the idea was to install pine tongue and grove boards right onto the rafters, but the plastic and insulation pushing down just made it too difficult. Now that a solid OSB base is installed... time to install the pine. I used a chalk line each time before installing the first lines of the boards just to make sure everything was straight.
Toughest part first, cutting around the lights. |
Middle section all done. |
Side section done. |
All done! |
Still need to add trim to clean up edges, but a closer look. |
No comments:
Post a Comment