Thursday, March 27, 2025

Details

Little details to get things ready to complete... I was waiting on the plumber to return to finish up the shutoff valves under the sink.

Gotta do the drain myself. You can see me test fitting the water filters behind.

And then the oven was a question. I had an old 3 prong outlet and plug for my previous oven, but current ones use a 4 prong outlet/plug. I had my electrician over and luckily, I had the ground wire for that 4th connection needed for the 4 prong outlet, so a new wire run wasn't needed. He sorted that and the oven connection (they never have the cord installed on new ranges).



I ended up buying more lights as well for the drawers in the pantry, as it felt weird with every other drawer being lit except for the pantry ones.


And then, another little detail is that I got some almond caulk to fill in gaps where the cabinets met the walls. On most cover panels, they weren't deep enough to keep a uniform reveal at the front of the cabinet while keep it uniform against the wall too. Caulk was my solution and so far, I makes things blend well.

Example of caulk to fill in a gap.



No comments:

Post a Comment